E-DEVIS
D
ARTISANS
+
24

Canton : Neuchâtel

Screed contractor — Neuchâtel

Screed contractor — Neuchâtel. No registered company currently covers this location for this trade. Our team reviews your request. The number and timing of responses are not guaranteed.

Screed contractor

Work and requirements

  • Area in m² and number of rooms, available depth between slab and finished floor
  • Type of screed wanted: sand-cement, liquid anhydrite, with insulation or underfloor heating
  • Floor covering planned afterwards (tiles, parquet, resin) and condition of the existing slab
  • Access for the pump or lorry, storey, preferred date and overall building schedule

Request a quote in Neuchâtel

Quotes and timescales are agreed directly with the companies.

Companies matching your search

No active company currently matches this trade and these postcodes. You can submit a request; forwarding after review will depend on eligible companies.

Postcodes covered : 2300, 2000

Localities in the canton

Frequently asked questions

How long before the floor covering can be laid?

The screed itself is laid in a day but then has to dry: around four weeks for a cement screed, often less for anhydrite, depending on thickness and ventilation. The screed contractor or the floor layer measures the moisture before any covering goes down; the schedule is set out in the quote.

What does e-devis.ch do and who is responsible for the work?

e-devis.ch connects private clients with registered screed contractors: we review your request and forward it to companies covering your postcode. The contract is concluded directly with the company, which alone is responsible for its quote, the flatness of the screed and the drying times it states.